Seanogy Facilities
Our Facilities

State-of-the-Art Environmental Management Center

Discover Seanogy's advanced facilities designed for safe, efficient, and compliant environmental solutions, including our TSD-certified site in Lipa City, Batangas.

Our Facility

State-of-the-Art Facilities

Seanogy Facility

TSD Certified Facility

The Seanogy Facility in Lipa City, Batangas, is a Category D, E, and F Hazardous Waste TSD Facility with TSD Registration No.: OL-TR-R4A-10-000278.

Facilities and Technologies

Our Decontamination Mobile Unit (DMU) utilizes Sea Marconi’s patented continuous closed-loop dehalogenation process (CDP PROCESS®), which is deemed as Best Available Technique in decontaminating PCBs by the Italian Ministry of the Environment, the Territory, and the Seas through the Decree 29/01/2007.

Technology

Key Advantages of CDP PROCESS®

Guaranteed Compliance with ASTM Standards for Mineral Insulating Oil

Demonstrated results showing regenerated mineral insulating oil, with quality passing the ASTM D3487-16.Proven track record in achieving PCB-free concentration of less than 2 mg/kg.

Extends the Life of Equipment

Regenerates mineral insulating oil and removes all physical and chemical contaminants inside the equipment.Prevents equipment from becoming a waste.

Substantial Financial Benefits

Extends the life of the existing equipment and mineral insulating oil.Simplified mineral insulating oil maintenance.Potential revenue from the sale of decontaminated metals and regenerated mineral insulating oil.

Safe and Environmentally Sound

Closed-loop decontamination facilitating resource conservation and minimization of waste.Zero emission and effluent.Integrated with effective safety controls.

Minimal Downtime with Onsite and Onload Decontamination Process

Continuous transformer operation during the decontamination process.Maximum of 8 hours of transformer shutdown for DMU connection and disconnection.